Skip to main content

Built on Trust. Backed by Engineering.

Milestone Inspections, SIRS & Recertification.

Florida PE-led engineering for South Florida condominium boards, associations and property managers.

Florida license
Licensed Florida PEVerify license →
Service area
Broward · Miami-Dade · Palm Beach
Governing law
§553.899 · §718.112See the compliance guide →
TALK TO AN ENGINEER
Within two business daysBook a 15-min call →

For boards and property managers

Received a notice? Start here.

We just received a milestone inspection notice. How long do we have, and what happens first?

Florida law gives the association 180 days from receiving the notice to complete Phase 1, meaning a licensed engineer or architect has submitted the Phase 1 report to the building department. The association must also notify unit owners within 14 days of receiving the notice. Phase 1 is a visual inspection of the building's major structural components. If it finds no signs of substantial structural deterioration, Phase 2 is not required. In Broward, Miami-Dade and Boynton Beach the notice comes through the local recertification program, and the deadline printed on that notice is the one that governs.

Send us the notice first. A Fortis PE confirms the deadline on it, the scope the building department is asking for, and what your records already show.

F.S. §553.899(5)–(7)

Does our building need a milestone inspection, and when is it due?

F.S. §553.899 applies to buildings of three or more habitable stories that are wholly or partly condominium or cooperative residential property. The first inspection is due by December 31 of the year the building reaches 30 years from its certificate of occupancy, then every 10 years. A county or city building department may adopt a 25-year trigger.

  • Broward: 25 years, countywide. The county recertification program is how the milestone requirement is administered and satisfied: one process, not two.
  • Miami-Dade: 25 years for condominium and cooperative buildings of three or more habitable stories with a certificate of occupancy in 1998 or later, inside the three-mile coastal zone; 30 years everywhere else. The county recertification program is how the milestone requirement is administered and satisfied.
  • Palm Beach: city by city. Boynton Beach applies 25 years to condominium and cooperative buildings of three or more stories and to threshold buildings, and the City's recertification program is how the milestone requirement is administered and satisfied for the buildings it covers. Highland Beach has adopted 25 years. Boca Raton has its own ordinance: 25 years within three miles of the coast, 30 years otherwise. Elsewhere in Palm Beach County the state 30-year default applies unless the local building department has adopted otherwise; confirm with it.

F.S. §553.899(3); Miami-Dade County Code §8-11(f); Broward BORA Policy #05-05

Is a milestone inspection the same thing as our SIRS or our county recertification?

The milestone inspection and the SIRS are two separate requirements.

  • Milestone Inspection (F.S. §553.899): a structural inspection, triggered by the certificate-of-occupancy date, repeated every 10 years.
  • Structural Integrity Reserve Study (SIRS) (F.S. §718.112(2)(g)): a reserve study of the building's structural components, triggered by the condominium's creation, repeated every 10 years. It applies to condominium buildings of three or more habitable stories.
  • Building Recertification: in Broward and Miami-Dade, the county recertification program is how the milestone requirement is administered and satisfied. In Boynton Beach, the City's recertification program does the same for the buildings it covers. Recertification does not replace the SIRS, and a recertification completed for an earlier cycle does not cover the current one.

A Fortis PE separates the three on first review of a board's records and reports which are current and which are due.

What if Phase 1 finds something?

Phase 2 is triggered by findings, not by the building's age. If Phase 1 identifies substantial structural deterioration, Phase 2 follows: a closer inspection of the affected areas, which may include destructive or nondestructive testing at the least disruptive locations. A progress report with a completion timeline is due within 180 days of the Phase 1 report. The sealed Phase 2 report is what the board uses to plan repairs.

Phase 2 scope and cost follow from what Phase 1 found. A Fortis PE walks the board through the Phase 1 report before any Phase 2 engagement, so the association knows what it is funding and why.

F.S. §553.899(2)(b), (7)

What does it cost, and who pays?

Phase 1 pricing depends on building size, number of structures, access and the scope the building department requires. Fortis quotes each association after reviewing its records and the notice, and does not post a flat rate because every association's scope is different.

The association pays. How it funds the inspection, whether from reserves, a special assessment or a loan, is a decision for the board under its governing documents, with its counsel and CPA. The engineer does not advise on it.

Florida requirements reviewed: 2026-10-19

Why Boards Work With Fortis

Engineered for fiduciary peace of mind.

01 / Licensed FL PE Oversight

Fortis

Every assessment is performed under the responsible charge of an active Florida Professional Engineer.

02 / Tri-County Jurisdictions

Broward · 25-Yr Recertification
Miami-Dade · §8-11 Recertification
Palm Beach · Per City Ordinance

Prepared and filed to each jurisdiction's current requirements — milestone inspections under F.S. §553.899.

03 / Independent Advocacy

We diagnose.
We don't sell repairs.

No restoration contracting, no building-product sales, no contractor referral fees — so our findings protect your reserves, not a repair invoice.

Conflict-Free Oversight

04 / One Documented Standard

Every finding photo-logged and carried into one PE-sealed report a board can act on.

Separate purposes. Separate clocks.

One building.
Two clocks.
Neither one waits.

The milestone inspection and the Structural Integrity Reserve Study are separate obligations under Florida law. They exist for different reasons. They run on different schedules. Reading one clock does not tell you what the other says.

The clocks below run on real statutory dates — §553.899 for the milestone inspection, §718.112(2)(g) for the SIRS. In Broward and Miami-Dade, the milestone clock is coupled to county recertification; the SIRS clock is not.

Clock 01
Milestone Inspection
§553.899 · trigger 25 or 30 yrs · recurring 10 yrs
04years to next
Next milestone inspection due 2030. In Broward, satisfied through county recertification — 25 years countywide.
Clock 02
SIRS
§718.112(2)(g) · reserve study · recurring 10 yrs
08years to next
Next Structural Integrity Reserve Study due 2034. Independent of milestone. Waiver restricted by statute.

In Broward & Miami-Dade, county recertification is how the milestone clock is administered — SIRS runs on its own clock.

1985
In Broward, the milestone inspection is administered through the county building recertification program and applies at 25 years countywide. SIRS is a separate obligation and is not replaced by recertification.
See the full compliance guide
Services · Point at what you're worried about

Every part of the building has an engineer's name for it. We know all of them.

Hover any part of the building to see the service that answers it, what triggers it under Florida law, and what a typical scope covers. The full catalog is a click away.

South Florida mid-rise · Cross-section10 stories · 1988
Interactive cross-section diagram of a South Florida mid-rise condominium building with 8 numbered hotspots. Each hotspot maps to a Fortis service: Roof & parapet (Building Recertification), Façade & balconies (Milestone Inspections), Window walls (Building Condition Survey), Structural frame (Structural Integrity Reserve Study), Garage & podium (Special Inspections), Foundation & slab (Forensic Investigations), Seawall & waterfront (Seawall Inspection), Active restoration (Owner's Representation).
Statutory · Fla. Stat. §553.899 · You pointed at façade & balconies
Statutory

Milestone Inspections

Concrete restoration, balcony spalling, railing anchorage — the visible failures that drive complaints and lawsuits. This is the Phase 1 milestone inspection. In Broward and Miami-Dade, a current county recertification satisfies the milestone requirement.

Triggered by
Fla. Stat. §553.899 · 25 or 30 yrs
Typical scope
Phase 1 visual, Phase 2 if triggered
Broward · Miami-Dade

The county recertification program satisfies the milestone inspection requirement in these two counties. SIRS is a separate obligation and is not replaced by recertification. In Palm Beach, the milestone inspection is administered directly under §553.899.

Local rule applies
How an inspection runs · 02 / 04

One rail.
Eight documented stops.

Intake through close-out on a single timeline. Every stage owns a deliverable, an owner, and a date. Nothing about your project lives in someone's inbox.

Start your project
§ 0Before we startClient-led · No fee until scope is signed
  1. 0.1
    Property details
    You send building name, address and any prior reports or notices.
  2. 0.2
    Requirement confirmed
    A call with the Fortis team to establish which scope of services applies.
  3. 0.3
    Written proposal
    Defined scope, fee and schedule signed before any field work begins.
§ 1 · The record · Stage 01 → 05
Every stage · Engineer-signed · Dated
  1. Scope & Records

    Relevant condo records and prior notices reviewed, so we know which requirements and deadlines apply to your building.

    Scope memo
  2. Field Inspection

    Every elevation, balcony, roof and garage slab walked and photographed by a licensed inspector — not a technician, not a subcontractor.

    Photo record
  3. Findings & Report

    Observation, evidence, recommendation, next step — signed by the engineer responsible for the work.

    Signed report
  4. Board Presentation

    We stand in front of your board, translate every technical term on first use, and answer owners directly.

    Board packet
  5. Repair & Oversight

    Restoration design, contractor selection support and construction administration through close-out.

    Construction admin
Gabor I. Nagy's signature
Gabor I. Nagy, PE
Author · The Fortis Standard · Rev. 4 · FL Licensed PE
Or call 954-756-6876
Fortis · A Lexicon · pp. 03–08

The words we
work by,
defined plainly.

Authored by
Gabor I. Nagy, PE
Founder · The Fortis Standard, Rev. 4
01Integrity| n. |

The reporting of what was observed, unaltered by budget or preference.

[at Fortis]Safety findings never soften to preserve a fee.
02Precision| n. |

Scope anchored to statute; evidence anchored to measurement.

[at Fortis]Reports withstand insurance, mediation and county review.
03Clarity| n. |

Language a non-engineer can act on without a translator.

[at Fortis]Every technical term is defined on first use.
04Hard Work| n. |

The willingness to be first on site and last to leave.

[at Fortis]The engineer signing the report walked the building.
05Trust| n. |

Consistency between what is promised and what is delivered.

[at Fortis]One documented standard, applied the same way every time.
06Community| n. |

A commercial relationship shaped by the other side's constraints.

[at Fortis]Scope is sized to what the building needs, not the fee we prefer.
Fortis BuildSafe Solutions · A Lexicon · p. 08
Read the full StandardAbout the Fortis Standard
§ III · Operating principles

Track Record

Four active recertifications and milestone inspections across South Florida. Click any building to open the case record.

Selected active projects. Full portfolio linked below.

Full Project Index →

Selected project records. Fortis BuildSafe Solutions · Broward & Miami-Dade.

See the full project list →

Founder

You Retain An Engineer,
Not An Account.

Gabor I. Nagy, PE, Founder of Fortis BuildSafe Solutions

Gabor I. Nagy, PE

Founder and author of the Fortis Standard — the documented method every Fortis engineer works to, so the answer does not depend on which engineer shows up.

RoleFounder
LicenseProfessional Engineer, State of Florida
BaseFort Lauderdale, FL
Service areaBroward · Miami-Dade · Palm Beach

Contact Fortis If

  • Your building needs a milestone inspection or recertification, with a deadline tied to its Certificate of Occupancy date.
  • Your association owes a Structural Integrity Reserve Study, or the last one was not based on a visual inspection.
  • A county recertification notice has been issued (Broward begins at 25 years, Miami-Dade at 30, each repeating every 10 years).
  • Cracking, spalling, leaks or movement need a documented cause before repairs are bid.

Latest Insight

From The Forensic File

Request an Inspection

Establish Where Your Building Stands.

Send the property details and Fortis will confirm which requirement applies and the scope of work involved. Prefer to talk? Call 954-756-6876.

Speak With A Member Of The Fortis Team.

Reviewed by a member of the Fortis team — reply within one business day

By providing my phone number, I agree that Fortis BuildSafe Solutions may contact me by telephone or text message regarding my quote request, project inquiry, scheduling, or services I requested. Message and data rates may apply.

Security check — tick the box if one appears.