Skip to main content

South Florida Board Reference

Florida Condo Compliance Guide

Start with the question in front of your board. Follow the guide from definition to deadline, comparison, service and county requirement.

Updated
August 23, 2026
Fortis line-art drawing of the South Florida condominium skyline with one tower marked on the compliance clock

04

Services

Match the building condition or obligation to the right engagement.

  1. 04.01

    All services

    Which structural, forensic and compliance engagements Fortis performs, and which one applies to a given obligation or deadline.

  2. 04.02

    Milestone inspections

    What a Phase 1 and Phase 2 milestone inspection under F.S. §553.899 involves, who must have one, and what the report has to contain.

  3. 04.03

    Structural Integrity Reserve Study

    Which components a SIRS under F.S. §718.112 must cover, how the visual inspection and reserve funding analysis are performed, on what cycle, and how a SIRS differs from a voluntary reserve study.

  4. 04.04

    Building recertification

    What Broward and Miami-Dade recertification requires structurally and electrically, how it satisfies the milestone requirement there, and what happens when a building misses the deadline.

  5. 04.05

    Pre-recertification inspections

    What a board can learn about probable repair scope and cost before it formally enters the recertification process.

  6. 04.06

    Seawall inspections

    How a seawall, bulkhead and cap are assessed above and below the waterline, and which failure signs precede loss of retained fill.

  7. 04.07

    Owner's representation

    Who protects the association’s interest during a restoration contract, and what an owner’s representative reviews, approves and rejects.

  8. 04.08

    Structural engineering

    Structural design documents signed and sealed by a Florida licensed professional engineer for existing buildings.

  9. 04.09

    Special inspections

    Inspections performed at specific stages during construction that certify work quality to the building department.

  10. 04.10

    Turnover services

    Engineering inspections and evaluation performed during the statutory turnover process under §718.301, Florida Statutes, at developer-to-association handover.

  11. 04.11

    Forensic investigations

    How the cause of a structural failure, leak or crack pattern is determined, and what evidence a report needs to survive scrutiny.

  12. 04.12

    Building condition surveys

    What a full building condition survey documents when there is no statutory trigger, and how the findings are prioritized.

  13. 04.13

    Building restoration oversight

    How a repair scope becomes sealed construction documents, and who verifies that the contractor built what the drawings specified.

05

Counties

Review the local rules for Broward, Miami-Dade and Palm Beach.

  1. 05.01

    Forensic Engineering Services in Broward County

    Which structural compliance obligations apply to a Broward building, including the 25-year recertification trigger and the milestone deadline.

  2. 05.02

    Fort Lauderdale forensic engineering

    How Fortis supports Fort Lauderdale condominium associations, HOA boards, owners and property managers from its local office, with one documented city project record.

  3. 05.03

    Pompano Beach forensic engineering and building recertification

    How the Broward Building Safety Inspection Program runs in Pompano Beach, including notice, report and repair timelines, the fee, exemptions, and why commercial buildings can owe a recertification.

  4. 05.04

    Forensic Engineering Services in Miami-Dade County

    Which recertification age applies to a Miami-Dade building by height and location, and how it interacts with the milestone requirement.

  5. 05.05

    Coral Gables forensic engineering

    How Fortis supports Coral Gables condominium associations, HOA boards, owners, and property managers under Miami-Dade recertification and Florida milestone requirements.

  6. 05.06

    Boca Raton structural and forensic engineering

    How Fortis supports Boca Raton condominium associations, cooperatives, HOA boards, owners, and property managers under the city milestone ordinance and the separate SIRS requirement.

  7. 05.07

    Coral Springs structural and forensic engineering

    How Fortis supports Coral Springs associations under Broward County recertification, which administers the Florida milestone requirement, and the separate SIRS requirement.

  8. 05.08

    Miami structural and forensic engineering

    How Fortis supports City of Miami associations under Miami-Dade County recertification, which administers the Florida milestone requirement, and the separate SIRS requirement.

  9. 05.09

    Belle Glade milestone inspections and forensic engineering

    How Fortis serves Belle Glade building owners on the 30-year statewide milestone cycle, with PE-sealed assessments grounded in Glades conditions rather than a coastal template.

  10. 05.10

    Forensic Engineering Services in Palm Beach County

    What Palm Beach County and its municipalities require of an aging condominium, and which local authority makes the determination.

Free Downloads

Free Board Guides

Free Download

The Board President's Guide to Florida's Building Safety Laws

A plain-language walkthrough of milestone inspections, SIRS, county recertification, and your board's personal exposure — what triggers each requirement and what your board must do next.

Security check — tick the box if one appears.

We won’t share your email. Unsubscribe anytime.

Free Download

The SIRS & Reserve-Planning Checklist

A print-and-walk checklist for your budget meeting: the eight required components, the reserve-funding rules that can no longer be waived, and what to confirm before you hire.

Security check — tick the box if one appears.

We won’t share your email. Unsubscribe anytime.

Next Step

Need help identifying what your building owes next?

Send the property details and a Fortis PE will confirm which requirement applies and when it is due.